Alto were appointed to carry out the remediation of an old industrial works factory in Leeds city centre on Whitehall Rd to prepare the ground for the construction of a further MSCP and office block development.
This site is immediately adjacent to the B&K site we previously worked on. The site is to be developed into a multi-story carpark and office block with Basement.
The remediation contract involved:
- Preparation of remediation strategy and MMP in accordance with the CL:AIRE protocol and approval with the regulators.
- Validation of the works during and post completion to allow discharge of Planning consent.
- Excavation of all material across site to a depth of 6m.
- Removal of all hard obstructions within building footprints and external works areas.
- Locating and analysing hazardous materials including asbestos, coal tar and tar covered cobbles.
- Removal of hazardous waste material from site to approved hazardous waste disposal site.
- Import 6F2 material to be used as fill in areas impacted by removal of material off site.
- Construction of Pile matt for both development plots.
- Reinstating back to a carpark until the main works commence.
Quick Facts
Client:
GMI
Programme:
11 weeks
Value:
£700,000