Alto was appointed by Galliford Try on the construction of a large new academy school in Bolton.
The works involved:
- 75000m3 of Bulk Earthworks to create level platform for the academy and the sports/MUGA pitches.
- Foundations to main and ancillary buildings
- Removal of excessively soft material and backfilling with imported clean aggregate, approximately 22,000m3
- Installation of 2 large attenuation tanks
- Installation of all Surface Water and Foul Water
- Installation of Gas Membrane
- Construction of all ground floor slabs
- Construction of all external works including landscaping
- Construction of a large Surface Water culvert (largest Precast units in UK at that time, Video included) and subsequent road construction.
- Section 278 works to form new entrance over culvert.
- Drainage Works related to underside of MUGA and new pitches.
Quick Facts
Client:
Galliford Try
Programme:
45 weeks
Value:
£3.96m