Alto were appointed to carry out the groundworks in the construction of three new NATO buildings with associated secure compounds at Beacon Barracks in Stafford.
Works comprised of:
- Pile Caps and beams
- Service entry and inspection pits
- Lift pits
- Ground floor suspended slabs
- CS2 gas membrane installation and validation of the same to all ground floors and pits.
- Installation of Surface Water and Foul Water drainage
- Construction of hydro brake manholes
- Installation of ducting and secure duct boxes
- Service trenches.
- External secure compound and vehicle parking areas.
Quick Facts
Client:
Henry Brothers
Programme:
45 weeks
Value:
£3.7m